Value recovered todayIDR 0

Planning / Work programme 2027 / Material plan

12 duplicates openSorong Warehouse, September 2026

Material plan 2027, draft one

Connected toe-ProcsyncingSAPsyncingDemonstration connection. No live link to Petrogas systems.
60 requests, 12 duplicates found
LooseStrict

At this setting, 12 duplicates found, 0 likely false matches.Threshold 80 percent. Likely false matches carry a hollow dot.

Showing 12 of 60
Page 1 of 5

Two requests, one part. Maintenance and Production both raised SEAL-KIT-P104-VITON. Merge them and the order drops from two to one.

Demand forecast, next twelve months

What consumption says will be needed, set against what the 2027 plan actually asks for.

Forecast demand

IDR 11.32bn

Twelve months ahead

Already in the plan

IDR 10.80bn

60 requests

Under-planned

IDR 751.78m

17 items short of forecast

Over-planned

IDR 26.47m

2 items above forecast

Sep 24Aug 26 · todayAug 27

Twenty four months of actual consumption, then twelve forecast months inside the band.

Showing 12 of 12
VLV-PSV-2J3-285Arar separator179+815 weeksmediumUnder-planned
MTR-AC-75KW-380Arar compressor house129+317 weeksmediumUnder-planned
TBG-278-J55-EUEWalio infill43+118 weeksmediumMatches plan
GEN-DSL-500-SPRSorong camp1211+125 weeksmediumMatches plan
SFT-RAFT-25PSorong jetty54+126 weeksmediumMatches plan
ELC-VSD-75KWArar compressor house65+121 weeksmediumMatches plan
PMP-CENT-100M3Sorong terminal33020 weeksmediumMatches plan
DB-PDC-8500-MRig Sorong 288011 weeksmediumMatches plan
INST-FC-FB3000Sorong metering33023 weeksmediumMatches plan
CSG-958-L80-BTCRig Sorong 256-124 weeksmediumMatches plan
WH-XTREE-5K-W07Walio 7 wellhead23-130 weeksmediumMatches plan
CMP-INSAIR-45Arar gas plant56-122 weeksmediumMatches plan

The forecast is computed from twenty four months of consumption held in this demonstration data, using a twelve month baseline, a year on year trend and a seasonal index. No figure here comes from a model you cannot inspect.